Finally the warm weather had arrived with the beginning of Spring.  The ice is gone and it is a perfect day for the delivery of the pre-fabricated dock box / change house.  A custom creation by Summerwood Products out of Markham Ontario.  This 93 square foot (9' x 10' 4") accessory structure was designed to the inch to be well under that the 108 square foot limit is legally allowed.   What I love about this structure is the roof.  The dormers and overhang allow for a ton of storage in the loft, which allows for my 12 foot stand up paddle board to be kept over winter.   The many windows allow for a lot of light to come in and make the inside look larger then it is.   

 

Summerwood delivered the dock box as they promised, on about 4 skids, and all pre-framed and partially assembled.   So no fumbling around in making the walls square, they were already done and sheathed.   Once the truck placed the skids on the side of the road, it took a few hours and a lot of heavy lifting to unload all the material onto the dock.   I was surprised for a 93 sq ft structure how much stuff there was. 

 

Luckily my brother and a couple neighbours came by to help lift and brought some much needed coffee and donuts.  The walls were all one piece and still very heavy for 3 people.   Within one day we had the walls and a couple roof gables assembled.  It was taking form fast!

 

With the dock elevation combined with the height of the dock box roof, this was getting beyond what my brother and I felt comfortably doing.   I hired Jared of Witward Construction out of Port Dover to assist in the rest.  He and his helper Ken were great with heights and had the structure looking top notch within a couple weeks.  

 

This was a tougher build then expected, yet it came together great and Summerwood provided enough extra pieces to allow for some custom cedar trim at the end.  

 

Now it's time to enjoy the dock, catch some fish and have a beer!

 

Summerwood Products

735 Progress Ave, Scarborough, ON M1H 2W7

www.summerwood.com

(416) 498-9379

 

Witward Construction

Port Dover

Jared - (226) 567-7006

 

 

 

Share on Facebook
Share on Twitter
Please reload

Action coming on Hastings Drive shoreline

August 7, 2019

Norfolk told to act on Hastings Drive

July 15, 2019

1/15
Please reload

You Might Also Like:
  • Corke Point
  • White Instagram Icon
Stephen Corke

I am the 3rd generation owner of Corke Point and

Long Point Ratepayers' Association Member

(647) 213-1026    

stephen@corkepoint.com

 

© 2023 Corke Point. Proudly created with Wix.com

This site was designed with the
.com
website builder. Create your website today.
Start Now